⚒
Underground Personnel Precision Positioning System - Shanxi Coal Mine
Project Results
- Static positioning accuracy better than 0.3 m, dynamic accuracy better than 0.5 m
- Personnel attendance statistics efficiency improved by 90%
- Emergency evacuation response time reduced to under 8 seconds
- 18 months of continuous operation with zero failures